Preparation work
① Arrange various temporary facilities, living and office rooms for employees, etc. Warehouses are set up as needed to minimize the investment in temporary facilities.
② Organize the entry of materials and machinery. Various construction materials and machinery should be registered by a dedicated person, and the construction progress should be done well. There should be a purchase plan. The procedures should be followed when entering and leaving the warehouse, and records should be kept carefully, and the specifications and quality of the materials should be guaranteed.
③ Do a good job in labor deployment. The labor force should be reasonably organized according to the actual construction method and progress plan. In particular, when parallel construction or cross-construction is adopted, more attention should be paid to labor deployment to avoid idle labor waste.
Hebei Shuoying Landscaping Engineering Co., Ltd has strong technical strength and a first-class service team. It supplies fountains, rockery, ancient buildings and other gardening buildings. Welcome to consult: 13785235269